Several cases of membrane structure construction

2015/10/16 10:38:53      view:2999
1) Yu Ji and the designated person (4 to 8) shall be appointed for the routine inspection and maintenance of the process to ensure the smooth flow of the membrane surface and drainage equipment.
2) strong winds, hail, heavy rain, snow and other severe weather process and process, the designated professional and technical personnel 4 on the project to stop the safety inspection, and timely eliminate hidden dangers,
1 3 years after the completion of the project, 4 professional and technical personnel to check the film structure can be in normal working condition, check the contents include: film surface has no larger deformation, film surface can be caused by the loss of pre tension and relaxation, film surface can be partially torn, film coating can be stripped, and can not be loosened.
4) as the membrane surface has large deformation, membrane surface due to pre tension loss and relaxation condition, making the two tension and timely implementation plan. 5) in case of membrane structure partial tear film material coating peeling condition should be repaired in time.
6) if the case of the joint part of the situation of the loose, tighten or reinforce.
7) regular training of the use of units within the warranty period to ensure that the use of units can be used normally.