The simplicity of tensioned membrane structure architecture make it cannot hide any design flaws, the relaxation of tension or discontinuous will be fully exposed, and will lead to membrane surface folds and deformation and reduce the service life of the structure. A brief introduction to the structure of membrane structure in Shenzhen membrane structure:
One, can be used to lift the method, the film body is divided into a number of pieces of the plane location, each film body also uses a number of overall lifting technology, the overall lifting in place. If the use of the overall upgrading of technology, equipment and personnel required to invest more, a longer construction period. The whole film is divided into 5 pieces, first pieces, third pieces, fifth pieces, sixth pieces, seventh pieces, eighth pieces, Ninth pieces, fourth pieces, tenth pieces, 7 pieces, second pieces, pieces, pieces, pieces, and pieces, each piece, each piece of work piece. After all the films are reached the design height, and then in the air will be each piece of work together, its superiority is quite obvious. Special attention should be paid to prevent the movement of the membrane in the wind load.
Two, before the film body, laying temporary fabric on the platform, in order to protect the film material is not damaged and membrane material clean, strictly according to the sequence of the film. The marks on the package should be marked before opening the package, and the installation position is confirmed and the film body is moved in the presence of the expanded film as far as possible. In the film surface to wear soft bottom shoes, not wearing hard objects, in order to prevent the film body is scratched.
Three. After the membrane body is expanded on the platform, the membrane material and the cable are fixed by using the splint. The specification and the spacing between the plywood should be strictly according to the design requirements. For a one-time lifting of the film body, it is also necessary to a splint bolts, nuts, screw in place